Abo (Harrison Gold)
Project | AU
DESCRIPTION
The Abo property (also known as Harrison Gold) is located 130km east of Vancouver and has seen significant drilling activity since 1975 including mapping, soil sampling, ground based geophysics and a total of 13,856m (45448ft) of diamond drilling.
The property was in good standing with previous owners from 1974 - 2000 when Eagle Plains crews acquired the ground within hours of its forfeiture. Property mineralization consists of a number of gold occurrences associated with a series of intrusive stocks. Accessory minerals include copper, silver, lead, zinc, molybdenum, tungsten and bismuth. The property is road-accessible year round, with hydroelectric power and rail-service located within 3 kilometers of property boundaries.
Historical diamond drilling work has defined a NI43-101 compliant Indicated Resource of 1.845 Million tonnes grading 2.79 g/t gold containing 165,000 oz Gold and an Inferred Resource of 0.6 million tonnes grading 2.8 g/t gold containing 55,000 oz of Gold.
Total Resources contained on the Abo property to date - 220,000 oz of Gold.
The management of Copper Canyon Resources Ltd. feels that there is excellent potential to increase the gold resource at the Abo both through drilling around existing mineralizaton and in areas that are as yet untested.
Recommendations for future work on the property are to conduct a two-phased program. The first phase would be to complete the compilation of historical data on the project and the second phase to test the results of phase one through surface mapping, geochemistry, trenching and diamond drilling.
The Abo project is currently available for option.
Updated March 24, 2010 |

Abo Project Summary (PDF)
Abo Project Map (PDF)
Project News:
Nov 12, 2009 - CPY/Bling Terminate Abo LOI
Sep 3, 2009 - CPY/Bling Sign Letter of Intent
Apr 16, 2009 - CPY Terminates Abo Option
Dec 18, 2008 - Option Agreement Amended
Feb 29, 2008 - Egoli Pays Cash and Shares
Nov 29, 2007 - Egoli Options Abo
Mar 23, 2006 - Exploration results on Abo
Dec 8, 2005 - Abo Drilling Commences
May 3, 2005 - Abo Drilling Complete
Feb 28, 2005 - Abo Drilling Commences
Jan 6, 2004 - Results of 2003 Exploration
Apr 22, 2003 - New Gold Zones Discovered
Feb 18, 2003 - Diamond Drilling Commences
Jan 9, 2003 - Gold Project Review
Oct 24, 2002 - Abo Option Executed
Oct 2, 2001 - Geophysical Commences
Sep 6, 2001- Project Area Increases
Jan 18, 2001 - Abo Project Acquired |